
Desalination process near Zadar completed: 36m3/h desalinator
The desalination process was completed in the camp near Zadar where there is a need for desalination of brackish water and obtaining drinking water in the amount of 36 m3/h.

The desalination process was completed in the camp near Zadar where there is a need for desalination of brackish water and obtaining drinking water in the amount of 36 m3/h.